Jump to content
British Speedway Forum

Swindon's New Stadium


Recommended Posts

You'll have to fit it inside a dog track, yes?

 

So there will be size issues.. Also, banking might be an issue because the doggies will need to be seen all the way around the track from the main stand? So, the banking won't be allowed to be to high, as it will obstruct parts of the dog track bends..? Just a thought....

Already have banking at the Abbey even tho' there is a dog track around it. Just need to have good drainage between dog track & speedway track & raise the dog track above the banking height, as at present track.
Link to comment
Share on other sites

Already have banking at the Abbey even tho' there is a dog track around it. Just need to have good drainage between dog track & speedway track & raise the dog track above the banking height, as at present track.

 

Then you get water run-off down the track banking, which erodes channels in the racing surface, can be difficult to eradicate in between meetings...

Link to comment
Share on other sites

You'll have to fit it inside a dog track, yes?

 

So there will be size issues.. Also, banking might be an issue because the doggies will need to be seen all the way around the track from the main stand? So, the banking won't be allowed to be to high, as it will obstruct parts of the dog track bends..? Just a thought....

It could be the same as the present track where the speedway track is lower than the dog track which allows for banking, the top of which is also below the level of the dog track, also the majority of scouring of the surface is where water comes off the dog track on to the speedway track because there is no drainage between the two.

Link to comment
Share on other sites

It could be the same as the present track where the speedway track is lower than the dog track which allows for banking, the top of which is also below the level of the dog track, also the majority of scouring of the surface is where water comes off the dog track on to the speedway track because there is no drainage between the two.

The usual arrangement is for the area between the tracks to be lower again, and/or have a ditch to hold the rainwater till it disperses into the ground after the meetings.

Link to comment
Share on other sites

Excellent news for Swindon, speedway, and last league meeting tonight at the Old Shabbey, chance to say ta ta to the old girl and those infamous back-straight bogs.

April 2017 if all goes to plan

Link to comment
Share on other sites

Excellent news for Swindon, speedway, and last league meeting tonight at the Old Shabbey, chance to say ta ta to the old girl and those infamous back-straight bogs.

April 2017 if all goes to plan

I thought the old bogs were an integral part of the new stadium? I'd heard the stadium plans had included them?

I thought the old bogs were an integral part of the new stadium? I'd heard the stadium plans had included them?

Incidentally, does anyone know if Sidney still guards them?

Link to comment
Share on other sites

I thought the old bogs were an integral part of the new stadium? I'd heard the stadium plans had included them?

 

Incidentally, does anyone know if Sidney still guards them?

English Heritage failed to save them, and they have sadly been condemned. One last visit tonight for old time sake, it will be packed in there, an emotional moment.

I heard keef and Sidney have been sectioned?

  • Like 1
Link to comment
Share on other sites

English Heritage failed to save them, and they have sadly been condemned. One last visit tonight for old time sake, it will be packed in there, an emotional moment.

I heard keef and Sidney have been sectioned?

I was told they were having a party in them last night.

  • Like 1
Link to comment
Share on other sites

Then you get water run-off down the track banking, which erodes channels in the racing surface, can be difficult to eradicate in between meetings...

Try reading what I said - "just need good drainage between dog track & speedway track"! This would prevent run-off onto the track!
  • Like 1
Link to comment
Share on other sites

Hopefully they will design it to have drainage between the dog track and the speedway track, and then good drainage on the inside of the speedway track, one can only hope that someone who knows what they are doing is involved with the design.

The usual arrangement is for the area between the tracks to be lower again, and/or have a ditch to hold the rainwater till it disperses into the ground after the meetings.

Try reading what I said - "just need good drainage between dog track & speedway track"! This would prevent run-off onto the track!

These will reduce or even eliminate many of the flooding problems we have had in the past and stop any track surface scouring.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. Privacy Policy